Since 2015 BESTEC has been assisting and supervising drilling operations in Turkey.
There geothermal energy has been developing very quickly. Within the year 2017, 277.8 MWe were installed (EGEC Geothermal Market Report 2017).
This is a great contribution to the energy turnaround!
Energy is what drives us naturally
Join us at GeoTHERM!
Together with Frost Consulting, we are looking forward to meeting you at Stand 65 in the Baden-Arena!
Energy is what drives us naturally
LSP installation in Rittershoffen, France.
BESTEC
By installing and commissioning a lineshaft downhole geothermal pump, BESTEC supported the commissioning of the first EGS heat plant in France.
Energy is what drives us naturally
The first EGS project in Pohang, South Korea.
BESTECBESTEC worked already for the second time in Pohang, South Korea. This is where the first EGS power plant in Korea is being built!
Energy is what drives us naturally
And the winner is...
BESTECYesterday at the GeoTHERM in Offenburg we received the first "European Geothermal Innovation Award" for our contribution to the development of commercial EGS projects!